Quality Control Center

More than 10 professional engineers

Constant temperature and humidity processing workshop

Imported processing equipment from the USA

World-class Quality Inspection


The machining center has dozens of senior engineers and is fully equipped with advanced production machines, such as machining centers imported from Germany and high-precision inspection equipment. It can handle inspection for high-volume and diverse production needs. By controlling the key processes of parts, it ensures product consistency and meets customers' requirements for high-quality production. Perker strives for excellence.


Product Testing Center

Raw Material Control: The filtration media (filter paper/filter mesh) must meet the ISO 4548 filtration efficiency standard. Production Process Control: Folding accuracy deviation ≤0.3mm, no bubbles/cracks at bonding points; assembly must meet sealing torque requirements. Finished Product Testing: Three core tests must be performed—filtration efficiency, differential pressure resistance, and life simulation. Compliance and Traceability: Certified under ISO 9001/TS 16949, products are labeled with batch codes to ensure full traceability from raw materials to production and shipment.

Development Advantages

Through engineering breakthroughs, a commitment to supporting team members and communities, and a continuous pursuit of a cleaner, more sustainable future, Parker leads us toward a better tomorrow. Globally, Parker team members and their technology play a key role in helping us achieve our goals and create a better future for generations to come.

Full Lifecycle Biodiesel Filtration Thinking


With the rapid global promotion of biodiesel and various synthetic fuels, biodiesel filters are upgrading from being 'low-value components' to 'invisible guards' that ensure stable equipment operation. The quality of their design and material compatibility directly affects whether equipment can operate reliably over the long term in high-blend biodiesel environments. For markets like Indonesia and similar regions, a systematic multi-stage filtration and water separation solution, along with material adaptation and maintenance strategies, is key to ensuring the 'survival' of engines and equipment while reducing costs and increasing efficiency.


Production

assembly line, supported by experienced technical engineers and supporting resources in the industry, is equipped with core assembly equipment (including high-precision bolt tightening machine, automatic pressing machine, and automatic gluing machine) and test equipment such as a comprehensive engine test bench. Before assembly, the cylinder body, cylinder cover, and crankshaft have been ultrasonically cleaned to ensure the cleanliness of the assembly effectively. During assembly, an accurate group measurement was carried out for each component. Two groups of moving components of the same set have been grouped again to achieve uniform weight and dimensional tolerance, improve the movement smoothness of the components, protect the moving components and their surrounding accessories from being damaged, reduce the power loss/failure rate, prolong the overall service life and improve the production efficiency.

Air Compressor Assembly Line

air compressor optimizes and upgrades the material and process of core components, intake and exhaust system and cooling system, with low wear rate, low exhaust temperature and low oil consumption. Control the assembly process of double-cylinder compressor, make the weight grouping of two cylinders’ moving components, improve the smoothness of the movement, protect the moving components, prevent the damage of peripheral accessories, reduce the failure rate, and achieve the precise control of technical parameters. It is equipped with professional equipment such as tightening machine, pressing machine, comprehensive testing bench to improve the quality and detection ability of the product assembly process.

Turbocharger Assembly Line

turbocharger power range is 290-460HP and applicable to the diesel engines of Euro II to Euro VI. Turbocharger is a precision assembly and requires high cleanliness of the parts. Before assembly, parts need to be deeply cleaned. The tightening machine and balancing machine are equipped to control the tightening, seal ring transmittance, axial clearance and radial clearance during the assembly process, adjust the opening pressure of the bypass valve, and perform dynamic balance detection on the core moving components to meet the technical requirements.